The Classical Academy – Multiple Campus Locations

Colorado Springs, CO

Location

Colorado Springs, CO

Project Size

Varies

Project Timeline

Varies

Year Completed

2021

Elder Construction has had the honor of partnering with The Classical Academy (TCA) on projects on multiple campus locations.

TCA North (25,000 SQ. FT.  •  2021):

This improvement project to TCA’s North campus includes a significant addition to the northeast side of the building. Elder Construction and FBT Architects constructed a junior high\high school music suite, a wrestling room, a weight room, locker rooms, team rooms, a training room, and a medical room housing Colorado’s premier sports medicine and physical therapy practitioners. These new spaces are connected to existing building corridors with seamless integration, providing easy access for use during and after school functions.

TCA Central (72,000 SQ. FT.  •  2017):

The TCA central campus remodel & addition project comprised remodeling the existing elementary school and constructing a new 2-story addition. The remodel involved new finishes throughout, adding new lighting upgrades and remodeling of the bathrooms. A new library was created for the students with new storefront glass and glazing systems which gave the building an updated look, while new fire sprinklers and HVAC systems provided up-to-code safety and comfort. The new 2-story addition allowed for new classrooms, break area security station, and a new main atrium entrance.

TCA East (85,000 SQ. FT.  •  2009):

The TCA East campus project evolved from an original design for a K-6 facility into an addition to an existing college campus. This new addition retained the capacity for the K-6 needs, but brought in the TCA College Pathways program and additional classrooms for Pikes Peak Community College. The project was a successful and groundbreaking facility that charter schools and state colleges will be referring to for future needs.

“As the project at our Central Elementary campus is nearing completions, Dave and I want to take a minute to express our sincere appreciation and gratitude to the entire Elder Team for everything they’ve done throughout this “adventure.” From day one, the professionalism, courteousness, care, and concern shown by every Elder team member has been phenomenal.” -Russell J. Sojourner, TCA President, David J. Tubb, TCA Director of Operations

“We want to convey our appreciation to Elder Construction for their superb work to complete this construction project. The partnership – each step of the way – was absolutely outstanding. The Best!! It is indelibly clear, the professionalism and performance of Elder Construction, allowed us to accelerate our schedule, save hundreds of thousands of dollars and still gain a remarkable high-quality facility.” – Kevin Collins, TCA CFO