The Hop Grenade
Fort Collins, CO
Location
Fort Collins, CO
Project Size
5,220 SQ. FT.
Project Timeline
3 Months
Year Completed
2017
The Hop Grenade was completed in the summer of 2017 through a collaboration between Elder Construction, VFLA Architects, and the Hop Grenade. Design and collaboration begin in the fall of 2016 through a series of design concepts and “real-time” pricing exercises which allow the team to reduce redesign efforts and ensure the project aligned with the Hop Grenade budget. Special bar elements and banquet seating were completed through integration of a specialty contractor hired by Elder Construction in conjunction with design concepts provided by The Hop Grenade Team.