Project Size

9,500 SQ. FT.

Project Timeline

6 months

Year Completed

2015

The Hartford Homes Corporate Office was a design-assist collaboration between Hartford Homes, Infusion Architects and Elder Construction. This fast-track project began in the fall of 2014 with site plan design, and was completed in July 2015. As a cost plus GMP with early release of the pre-engineered metal building and site work bid packages, this project was able to be completed within nine months, from beginning the design and Town of Timnath Site planning process.

“Building an office while still running a business can be overwhelming. Elder guided me through this process and made it enjoyable. They delivered a quality product with the highest level of integrity throughout the whole process. I would recommend them to any business owner.” –Landon Hoover, President